MYTEK PROS / CONNECTED OPERATIONS
Building Management Integration
Connect new sensing and compatible legacy building systems.
Plan your project
01 / THE OPPORTUNITY
Connect the systems your building already uses.

BMS integrators, facility managers and building owners
Useful sensor data often sits outside the building-management system where operators already work.
Start with a point-by-point integration plan, then bring selected telemetry and approved controls into a consistent operating view.
- Extend visibility without unnecessary equipment replacement
- Reduce disconnected dashboards
- Make operating data easier to compare
APPLICATIONS IN PRACTICE
Map the signal before the action.
Illustrative scenarios for facilities teams and operators.


An office adds air-quality sensors to an existing BMS.
ObserveMap verified sensor values into agreed BMS points.
ActDisplay trends and route approved threshold notifications.
ReviewRoom conditions with point freshness and source labels.
Do not promise automatic ventilation control before commissioning.

A hotel has separate room-control and utility data.
ObserveAlign supported points and timestamps.
ActCreate a common operational view for facilities staff.
ReviewRoom comfort, runtime and meter trend comparison.
Energy correlations are not causal proof.

A campus wants to retain legacy meters.
ObserveRead compatible registers through an appropriate interface.
ActValidate readings against the existing meter display.
ReviewMeter integration acceptance and ongoing data-health report.
Any unsupported protocol requires a separate adapter or integration.
03 / FROM SIGNAL TO RESPONSE
From observation to action.
Define the signal, the connection and the person responsible for the next step.
View measurements & event details
- Device measurements and states exposed through supported interfaces
- Readable meter or equipment registers
- Supported control points only after validation
Proposed service workflow
A measured route to building-control changes
- Observe
Room conditions and compatible HVAC state
- Connect locally
Site gateway or BMS interface
- Collect securely
Proposed collection and control integration
- Review and act
Operator reviews; approved rule may request a change
- Keep a record
Command, acknowledgement and condition history
Optional control request: Compatible interface, bounded setpoints, permissions and commissioned control logic
A DEFINED SERVICE SCOPE
What Mytek Pros can help deliver.
For a San Diego building, Mytek Pros can inventory existing interfaces and map compatible sensor, meter and equipment points into the agreed BMS view. Read-only validation checks values, units and timestamps before any separately approved control commissioning.
Explore service planning for San Diego and California projects. Installation, handover and ongoing support are agreed during discovery for the selected equipment and site.
View planned service deliverables
- Protocol, point and register inventory
- Field-device and network integration design
- Naming, units and timestamp normalization
- Read-only validation before approved control commissioning
THE RECORD YOU KEEP
Your reporting scope.
A configured Mytek Pros service can turn the selected measurements into:
- Unified point-health and data-availability report
- Cross-system event timelines
- Equipment and environmental trends with source provenance
Configurable project options; confirm scope during discovery.
04 / DISCOVERY & DESIGN
Before installation.
Confirm compatibility, placement and operating responsibilities for your site.
What we’ll work through
- BACnet, Modbus, KNX and M-Bus support depends on the selected gateway/interface
- A shared protocol does not guarantee application-level compatibility
- Secure network design, access controls and firmware review are required
- Control writes need explicit mapping, fail-state and safety approval
Tell Mytek Pros about your site, existing systems, and the decisions you want the data to support.
Review your BMS integration points ↗EXPLORE CONNECTED APPLICATIONS